导读:Restriction of GI to production order after CNF / Restriction of GI to production order after CNF /Hi folks,I want to restrict the GI to production order (T/code MB1A, Mvt Type 261) after th...
Restriction of GI to production order after CNF /
Restriction of GI to production order after CNF /
Hi folks,I want to restrict the GI to production order (T/code MB1A, Mvt Type 261) after the production order is fully confirmed and devlivered (status CNF and DLV). How can I do that,Please suggest,Thanks / Sukhad
你的老师
1年前他留下的回答
已收到1个回答
秀赫
网友
该名网友总共回答了15个问题,此问答他的回答如下:采纳率:86.7%
Thanks for the reply,This is being done currently, Is there any other way / method which can ensure mistake-proofing and can automate the system?Best regards/Sukhad
1年前他留下的回答
1
以上就是小编为大家介绍的Restriction of GI to production order after CNF / 的全部内容,如果大家还对相关的内容感兴趣,请持续关注上海建站网!
标签:
内容声明:网站所展示的内容均由第三方用户投稿提供,内容的真实性、准确性和合法性均由发布用户负责。上海建站网对此不承担任何相关连带责任。上海建站网遵循相关法律法规严格审核相关关内容,如您发现页面有任何违法或侵权信息,欢迎向网站举报并提供有效线索,我们将认真核查、及时处理。感谢您的参与和支持!